on ARVERNE GROUP S.A. (isin : FR001400JWR8)
Arverne Group launches a geothermal installation in Pau
Arverne Group begins drilling work for the geothermal installation of the Biotope project, future headquarters in Pau. This site will offer a hot/cold system thanks to 11 geothermal probes located at a depth of 195 meters, connected to a geothermal heat pump. Electricity will come from a solar installation on the roof, ensuring fully renewable energy.
The project, developed by the Essor group and the Camborde Architectes agency, is located on a 7,500 m² plot of land. It aims to combine the environment and employee well-being, aligning with Arverne Group's environmental responsibility objectives.
Delivery of the first phase comprising 2,700 m² of offices is scheduled for the first quarter of 2025, reinforcing Arverne Group's commitment to the energy transition.
R. H.
Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all ARVERNE GROUP S.A. news