on Athena Gold Corporation (NASDAQ:AHNR)
Diamond Drilling Begins at Athena Gold's Excelsior Project
Athena Gold Corporation has initiated its inaugural diamond drilling campaign at the Excelsior Springs project in Nevada. This fully-funded initiative, supported by Mammoth Minerals Limited under an option agreement, aims to delineate the geometry and extent of gold-silver mineralization at the Buster Trend. The historical Buster Underground Mine has recorded production of 19,200 ounces at a grade of 41 g/t of gold.
The drilling will provide crucial metallurgical and geotechnical samples. These samples will enhance the understanding of mineralization controls and support development planning. A second drill rig is expected soon to accelerate the program. The project has historical intercepts, including 51.8m at 4.00g/t Au that highlight its potential.
Additionally, metallurgical testing will assess leaching characteristics to optimize processing strategies, while geotechnical logging will contribute to future studies. Adjunct surveys include property-wide magnetics and LIDAR, providing comprehensive geological data.
R. E.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Athena Gold Corporation news