on Brenmiller Energy (NASDAQ:BNRG)
Brenmiller Energy Unveils Milestones for Key TES Projects
Brenmiller Energy, a prominent provider of Thermal Energy Storage (TES) solutions, has announced significant milestones for its Tempo Beverages and Wolfson Medical Center projects. The company plans for both projects to generate revenue by late 2026 to early 2027.
The Tempo project will replace fossil fuel boilers with the bGen™ ZERO system at its Netanya facility, reducing emissions and potentially saving $7.5 million over 15 years. Construction is set to conclude in late 2025.
Meanwhile, Wolfson Medical Center will transition from diesel boilers to bGen™ ZERO, with completion targeted by late 2026. This switch is projected to save up to $1.3 million annually and cut emissions by 3,900 tons per year.
Brenmiller's innovative approach underscores its commitment to sustainable energy solutions with a focus on scalability and impact.
R. E.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Brenmiller Energy news