BRIEF

on Pyrum Innovations AG (isin : DE000A2G8ZX8)

First Warm-up of Line 3 Starts at Dillingen's Main Plant

Pyrum Innovations AG has initiated the hot commissioning of its third and final thermolysis reactor at the main plant in Dillingen, Germany. Following positive results from the second reactor, adjustments have led to a successful start of TAD 3. The heating process reached 650°C for the first time yesterday.

The aim is to quickly achieve a throughput of 75 to 80% of the target output. The first production run for thermolysis oil and rCB is scheduled for next week. Full capacity utilization of TAD 2 and TAD 3 is planned within six to twelve months.

CEO Pascal Klein expressed satisfaction with the smooth start and stated that the company is nearing the completion of its site expansion. Additionally, final commissioning of the power generation from the produced thermolysis gas will occur in the next few weeks.

R. E.

Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Pyrum Innovations AG news