on Lahontan Gold Corp. (CVE:LG)
Lahontan Gold Corp Engages RESPEC and KCA for Santa Fe Project Update
Lahontan Gold Corp has appointed RESPEC Company LLC and Kappes, Cassiday & Associates to update the technical report for the Santa Fe Mine Project. This update will include a new Mineral Resource Estimate (MRE) and Preliminary Economic Assessment (PEA). The MRE will incorporate data from drilling completed since October 2024, along with new metallurgical data and revised mining costs. This aims to refine the conceptual pit shells necessary for the MRE.
Kimberly Ann, Lahontan's Executive Chair, expressed optimism about updating the MRE, particularly the detailed 3D geologic model aiding in gold and silver grade interpolation. The updated PEA is expected to offer an enhanced operational model, crucial for mining scenarios over different metal prices. The completion of the MRE is anticipated in the coming months, with the PEA due by Q2 2026.
R. H.
Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Lahontan Gold Corp. news