BRIEF

on Q2 Metals Corp. (isin : CA74830U1049)

Q2 Metals Concludes Summer Drill Campaign at Cisco Lithium Property

Q2 Metals Corp. has completed its Summer 2024 Drill Campaign at the Cisco Lithium Property in James Bay, Quebec, Canada. The company conducted five drill holes, totaling approximately 2,609.9 meters, with all holes intercepting pegmatite containing spodumene mineralization.

Drill hole CS24-022 encountered 14 spodumene-pegmatite intervals, the largest continuous interval being 52.3 meters. Drill hole CS24-023 hit 15 intervals, the widest reaching 188.6 meters. Since May 2024, 17 holes totaling 6,359.7 meters have been drilled.

Q2 Metals' President and CEO, Alicia Milne, expressed satisfaction with the initial drill season. VP of Exploration, Neil McCallum, emphasized the project's potential and the anticipation of forthcoming assay results. Samples from the final drill holes are now with SGS Canada for mineral analysis.

The campaign aimed to explore the connection between wide pegmatite zones found in earlier drill holes, which have been confirmed and expanded in the latest drilling efforts. All results will help refine the understanding of the pegmatite zones at the Cisco Property.

R. P.

Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Q2 Metals Corp. news