on Snowline Gold Corp. (isin : CA83342V1040)
Snowline Gold Strengthens Mineralization at Valley Deposit, Yukon
Snowline Gold Corp. reports positive results from its Valley deposit drilling campaign in Yukon, Canada. Key highlights include hole V-24-081 yielding 2.10 g/t Au over 433.5 m and hole V-24-084 with 1.31 g/t Au over 273.2 m. These results enhance the near-surface mineralization scale and outperform initial mineral resource estimate models.
The company completed Phase I reclamation at the historical "Plata" area, organizing debris from past mining activities. Snowline awaits assay results from over 24,600 m of drilling across multiple targets in their 2024 exploration campaign.
Further efforts include site cleanup at the Plata staging area, pivotal for supporting Snowline's operations and contributing to long-term positive impacts on Yukon mining practices.
R. H.
Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Snowline Gold Corp. news