on Troy Minerals Inc. (CVE:TROY)
Troy Minerals Completes Summer Exploration at Table Mountain Silica Project
Troy Minerals Inc., based in Vancouver, has concluded its 2025 summer field exploration at the Table Mountain high-purity silica project in British Columbia. The project area has been expanded by 222.2 hectares, now totaling 2,526.3 hectares. This expansion covers the northern continuation of the main quartzite zone.
The company conducted extensive geological prospecting and additional channel sampling in the main mineralized zone. Two bulk samples weighing approximately 250 kg were collected for metallurgical studies. A UAV LiDAR survey covering 3.5 square kilometers was completed in preparation for future drill planning and resource estimates.
Drill permit applications have been submitted for the 2026 season. Troy aims to advance resource development at Table Mountain, leveraging its strategic location near existing high-purity silica operations.
R. H.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Troy Minerals Inc. news