on Waga Energy (EPA:WAGA)
Waga Energy initiates its first biomethane project in Italy
Waga Energy, in partnership with Centro Servizi Ambiente Impianti (CSAI), is launching a biomethane production project in Terranuova Bracciolini, Tuscany. The project is based on the patented WAGABOX® technology, which transforms waste biogas into biomethane. The Podere Rota site, in the post-operation phase since 2022, will serve as the base for this transformation. The biomethane produced will be injected into the Italian grid and sold under a ten-year private purchase agreement.
The plant, scheduled for 2026, is expected to produce 29 GWh of biomethane per year, enough to power 3,400 Italian homes. This project could avoid the emission of 5,900 tons of CO2eq annually by replacing fossil gas with renewable gas. Through this initiative, the partnership aims to reduce greenhouse gas emissions and strengthen local energy independence.
R. E.
Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Waga Energy news