PRESS RELEASE

from Blue Lagoon Resources Inc. (NASDAQ:BLAGF)

Blue Lagoon Encounters Additional Significant Intersections from Drilling Along Strike West of The Boulder Vein Resource

VANCOUVER, BC / ACCESSWIRE / February 14, 2023 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce final results from the 2022 Phase II drilling program on its year-round, road accessible, Dome Mountain Gold Project, located a short 50-minute drive from Smithers, British Columbia.

Significant intersections from drill holes drilled along the western strike extension of the Boulder Vein, include:

  • DM-22-280 - 8.68 g/t Au, 68.4 g/t Ag and 0.27% Cu over 3.55 meters including 24.40 g/t Au, 158.0 g.t Ag, 0.50% Cu over 0.60 metres, and,
  • DM-22-283 - 7.28 g/t Au, 60.0 g/t Ag and 0.94% Cu over 3.87 meters, including 14.98 g/t Au, 78.5 g/t Ag, 0.53% Cu over 1.40 metres

These drill holes were part of a series of holes to test the Boulder structure at depth (> 200 metres from surface) and along strike to the west beyond the current (2021) resource model.

DM-22-280 intersected typical quartz-carbonate vein material within altered tuffs, mineralized with mainly pyrite and lesser chalcopyrite, sphalerite and galena at a drill depth of 226.00 to 229.55 metres grading 8.68 g/t Au, 68.4 g/t Ag and 0.27% Cu over 3.55 meters including 24.40 g/t Au, 158.0 g.t Ag, 0.50% Cu over 0.60 metres. The vein orientation appears to be steeper in this area - greater than 70° to the south.

DM-22-283 intersected two wide mineralized quartz-carbonate veins and strong clay-sericite altered zones, with the upper zone from 307.00 to 316.00 metres returning 3.69 g/t Au, 28.2 g/t Ag, and 0.43% Cu over 9.00 metres, including a higher grade core of 7.28 g/t Au, 60.0 g/t Ag and 0.94% Cu over 3.87 meters. The lower zone was drilled from 349.30 to 364.45 metres, returning 1.97 g/t Au, 38.5 g/t Ag and 0.39% Cu over 15.15 metres, including 4.30 g/t Au, 80.0 g/t Ag, and 0.79% Cu over 4.27 metres. The lower zone also included a short interval (0.43m) of massive sulphides.

Table 1: Selected significant intersections (>1 g/t Au)

Hole

Intersection (m)

Grade

From

To

Length

True Width 1

Au (g/t)

Ag (g/t)

Cu (%)

Pb (%)

Zn (%)

DM-22-276

234.00

236.00

2.00

1.33

2.42

10.7

0.050

<0.001

0.050

DM-22-276

242.00

244.00

2.00

1.33

1.04

5.2

0.070

<0.001

0.150

DM-22-277

244.90

247.00

2.10

1.84

1.92

14.6

0.090

0.230

0.370

DM-22-277

371.61

371.85

0.24

0.21

5.19

73.7

0.060

0.430

0.160

DM-22-278

6.23

6.55

0.32

0.25

7.26

87.0

0.730

0.100

0.050

DM-22-278

38.45

38.75

0.30

0.23

5.10

21.5

0.170

0.010

0.110

DM-22-278

123.30

125.30

2.00

1.49

1.55

1.5

0.010

<0.001

0.400

DM-22-278

321.56

322.00

0.44

0.32

1.73

96.0

0.340

0.360

0.630

DM-22-280

87.66

88.11

0.45

0.41

6.94

16.5

0.270

0.000

0.010

DM-22-280

226.00

229.55

3.55

3.14

8.68

68.4

0.270

0.410

2.310

incl

226.00

226.60

0.60

0.53

24.40

158.0

0.500

0.580

4.760

incl

227.09

228.37

1.28

1.13

6.31

42.1

0.170

0.160

3.010

incl

228.95

229.55

0.60

0.53

11.30

129.0

0.490

1.470

2.130

DM-22-280

332.00

334.00

2.00

1.76

1.02

0.9

0.010

<0.001

0.020

DM-22-281

216.00

219.00

3.00

2.20

1.35

11.7

0.100

<0.001

0.530

DM-22-281

237.30

238.00

0.70

0.51

1.25

1.2

0.010

<0.001

0.020

DM-22-281

323.75

323.95

0.20

0.14

4.18

291.0

3.430

0.260

0.400

DM-22-282

198.25

198.84

0.59

0.51

1.11

0.4

0.000

<0.001

0.010

DM-22-282

238.08

239.45

1.37

1.17

4.60

58.5

0.130

0.090

0.130

DM-22-283

307.00

310.00

3.00

2.14

1.66

6.3

0.050

0.010

0.200

incl

309.70

310.00

0.30

0.21

5.56

38.5

0.270

0.020

0.150

DM-22-283

312.13

316.00

3.87

2.75

7.28

60.0

0.940

0.270

0.550

incl

312.13

313.53

1.40

1.00

14.98

78.5

0.530

0.540

0.960

incl

313.99

315.00

1.01

0.72

5.42

87.0

2.020

0.190

0.580

DM-22-283

349.30

364.45

15.15

10.70

See all Blue Lagoon Resources Inc. news