News
-
-
-
PRESS RELEASE
Banyan Provides Summary of 2024 Diamond Drill Program, Airstrip and Powerline Deposits, AurMac Project, Yukon, Canada
Banyan Gold Corp. reports successful 2024 AurMac drill program results, revealing high-grade gold mineralization with potential for growth. New resource estimate expected in Q2 2025 -
-
-
PRESS RELEASE
Banyan Strengthens Technical Team with Appointments of Vice President of Exploration, Key Geological Positions and Independent Advisor
Banyan Gold Corp. appoints Duncan MacKay as VP of Exploration, Frank Wright as Metallurgy Advisor, Kate Hudek as Database/GIS Manager, and Keagan Parry as Senior Geologist to enhance exploration capabilities. Stock options granted for employees -
-
-
PRESS RELEASE
Banyan Intersects 15.9 Metres of 9.32 Grams per Tonne Gold, Airstrip Deposit, AurMac Project, Yukon, Canada
Banyan Gold Corp. reports positive results from the diamond drilling program at AurMac Project, Yukon Territory, showcasing high-grade gold zones. CEO Tara Christie highlights strategic value and future prospects -